This project involved installing vinyl plank flooring after removing the previous surface and preparing the room for a long-lasting finish. First, the existing flooring was removed and the subfloor was cleaned to identify imperfections and uneven areas. Next, leveling and surface preparation were completed to support proper alignment and stability. Then, the vinyl planks were installed with consistent spacing and a balanced wood-look pattern. As a result, the room now has a durable, updated floor with improved uniformity and a cleaner overall appearance.